Hockaday SPRING 2016

One section mocked up
One section mocked up
press to zoom
Carlyn and JC talk about vine
Carlyn and JC talk about vine

Setting up the model

press to zoom
Wire model to work on vine
Wire model to work on vine
press to zoom
Scoffolding
Scoffolding
press to zoom
Using metal to replicate the glass
Using metal to replicate the glass
press to zoom
Close up of design
Close up of design
press to zoom
Vine attachments
Vine attachments
press to zoom
Hanging the sculpture
Hanging the sculpture
press to zoom
Making adjustments
Making adjustments

As glass and extra weight was added, cables and attachments had to be adjusted

press to zoom

Spring 2016

  • Mock up sculpture

    • created a multi story scaffolding structure simulating site space

    • established installation protocol contingent on tetra interaction

    • changed joint attachment to accommodate added weight of tiles and panels

  • Creation of Cloud concept to expand on GFF's mounting points

  • Installation procedure and plan created

  • Documention noted